-
Notifications
You must be signed in to change notification settings - Fork 21
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
Add backend support for multi-run graphing #125
Draft
dbutenhof
wants to merge
4
commits into
cloud-bulldozer:main
Choose a base branch
from
dbutenhof:multi1
base: main
Could not load branches
Branch not found: {{ refName }}
Loading
Could not load tags
Nothing to show
Loading
Are you sure you want to change the base?
Some commits from the old base branch may be removed from the timeline,
and old review comments may become outdated.
Draft
Conversation
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This encapsulates substantial logic to encapsulate interpretation of the Crucible Common Data Model OpenSearch schema for the use of CPT dashboard API components. By itself, it does nothing.
This builds on the `crucible_svc` layer in cloud-bulldozer#122 to add a backend API.
This relies on the ilab API in cloud-bulldozer#123, which in turn builds on the crucible service in cloud-bulldozer#122.
When graphing metrics from two runs, the timestamps rarely align; so we add a `relative` option to convert the absolute metric timestamps into relative delta seconds from each run's start.
dbutenhof
added a commit
to dbutenhof/cpt-dashboard
that referenced
this pull request
Oct 24, 2024
This adds the basic UI to support comparison of the metrics of two InstructLab runs. This compares only the primary metrics of the two runs, in a relative timeline graph. This is backed by cloud-bulldozer#125, which is backed by cloud-bulldozer#124, which is backed by cloud-bulldozer#123, which is backed by cloud-bulldozer#122. These represent a series of steps towards a complete InstructLab UI and API, and will be reviewed and merged from cloud-bulldozer#122 forward.
dbutenhof
pushed a commit
to dbutenhof/cpt-dashboard
that referenced
this pull request
Oct 24, 2024
This adds the basic UI to support comparison of the metrics of two InstructLab runs. This compares only the primary metrics of the two runs, in a relative timeline graph. This is backed by cloud-bulldozer#125, which is backed by cloud-bulldozer#124, which is backed by cloud-bulldozer#123, which is backed by cloud-bulldozer#122. These represent a series of steps towards a complete InstructLab UI and API, and will be reviewed and merged from cloud-bulldozer#122 forward.
This was referenced Oct 24, 2024
7 tasks
dbutenhof
changed the title
Add relative X axis for multi-run graphing
Add backend support for multi-run graphing
Nov 7, 2024
This was referenced Nov 7, 2024
This was referenced Nov 18, 2024
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
Type of change
Description
Add a
GraphList
option to help when graphing across multiple runs by converting the X axis to a relative timescale in seconds from the beginning of each run rather than absolute timestamps.This is chained from #122 (crucible) -> #123 (ilab API) -> #124 (ilab UI) -> #125 (this) -> multi-run UI (TBD).
Related Tickets & Documents
PANDA-600, multi-run graphing, API.
Checklist before requesting a review
Testing
Tested manually with
curl
. UI support will follow.